雨棚的具體制作方法從十個方面了解

來源:http://m.gzwintom.com/ 日期:2022-10-19 發(fā)布人:
濟南雨棚通常是建于建筑物入口或陽臺之上,用于防雨或防止高空墜物的建筑設(shè)備。那么它的具體制作方法有哪些呢?本篇文章我們就從十個方面,為大家做一下闡述,希望對于各位的認識和理解有所幫助!
The canopy in Jinan is usually built on the entrance or balcony of a building to prevent rain or falling objects. What are the specific production methods? In this article, we will elaborate from ten aspects, hoping to help you understand!
1.加工準備及下料:按施工圖放樣,放樣時應(yīng)留出焊縫收縮量和加工余量,按放樣時作樣板。鋼結(jié)構(gòu)校正、鋼板預埋件和其它零件的切割鉆孔和噴涂防腐涂料處理。
1. Processing preparation and blanking: setting out shall be conducted according to the construction drawing. During setting out, the weld shrinkage and processing allowance shall be reserved, and the template shall be made according to the setting out. Correction of steel structure, cutting and drilling of steel plate embedded parts and other parts, and spraying of anti-corrosion paint.
2.測量放線:根據(jù)土建標高基準線對預埋件標高中心線進行測量,檢查預埋件標高偏差,左右偏差。通過整理結(jié)果,確定了預埋件分隔的調(diào)整處理方案。沿著地板外的彈出墨線,確定了預埋件的頂標高度。
2. Surveying and setting out: measure the elevation center line of embedded parts according to the civil engineering elevation datum line, and check the elevation deviation of embedded parts, left and right deviation. Through sorting out the results, the adjustment treatment scheme of embedded parts separation is determined. Determine the top mark height of embedded parts along the pop-up ink line outside the floor.
3.預埋件安裝工藝:定位預埋件安裝工藝,鉆孔安裝工藝。
3. Embedded parts installation process: positioning embedded parts installation process, drilling installation process.
4.是懸臂式安裝焊接。
4. It is cantilever type installation welding.
5.校驗。
5. Calibration.
6.連接受力拉索:定位拉桿的基準線,標高線,按要求安裝預埋件,焊接護欄。
6. Connecting stressed cables: locate the reference line and elevation line of the pull rod, install the embedded parts as required, and weld the guardrail.
濟南雨棚
7.不銹鋼玻璃爪安裝焊接:按設(shè)計尺寸彈出縱橫線和設(shè)計標高,用夾具夾住,點焊定位,組裝完畢,焊接玻璃爪基座。
7. Installation and welding of stainless steel glass claw: snap the vertical and horizontal lines and design elevation according to the design size, clamp them with clamps, spot weld them for positioning, and weld the base of the glass claw after assembly.
8.防銹的噴漆處理工藝。
8. Anti rust painting process.
9.夾膠玻璃加工制造安裝,不允許偏差大于規(guī)定偏差。
9. The deviation of laminated glass processing, manufacturing and installation shall not exceed the specified deviation.
10.調(diào)整檢驗:點式玻璃作整體調(diào)整檢驗,調(diào)整標準橫平,豎直,面平。偏離不能超過規(guī)定的偏離。然后分別進行上、下打膠、修補檢查、玻璃清潔、現(xiàn)場清理、竣工驗收。
10. Adjustment inspection: point glass shall be subject to overall adjustment inspection, and the adjustment standard shall be horizontal, vertical and flat. The deviation shall not exceed the specified deviation. Then the upper and lower gluing, repair inspection, glass cleaning, site cleaning and completion acceptance shall be carried out respectively.
總而言之,雨棚是一種很有要的建筑配件,本篇文章對它的做法進行了簡單的介紹,如果還想了解雨棚做法等更多的知識,還請繼續(xù)關(guān)注本站http://m.gzwintom.com其他相關(guān)文章,希望今天的內(nèi)容能給您帶來幫助。
In a word, canopy is a very important building accessory. This article gives a brief introduction to its practice. If you want to know more about canopy practice, please continue to pay attention to this site http://m.gzwintom.com I hope today's content can help you with other related articles.
此文關(guān)鍵詞:Array  Array  Array  Array  

閱讀/ Recommended reading

在現(xiàn)代生活中,伸縮棚作為一種靈活且實用的戶外設(shè)施,正逐漸走進人們的視野,廣泛應(yīng)用于各類場所。它不僅能為人們提供遮陽避雨的空間,還能根據(jù)不同需求調(diào)整使用面積,大大提升了空間的利用率和...

濟南雨棚的生產(chǎn)需要哪些事項 2025-02-12
伸縮蓬的設(shè)計與結(jié)構(gòu)功能 2025-01-22
推拉伸縮篷的材質(zhì)和用途 2024-12-28
雨棚安裝一個平方 2024-12-23

魯公網(wǎng)安備 37010302000864號